Layout preview: illustrative build story. Customer details, photographs and specifications to be added before publication.
RMF Equipment / Behind the build / Beaver tail trailers

Built around the load.
Ready for the next job.

A beaver tail trailer starts with the machinery it needs to carry. This example explores a custom layout shaped around loading access, usable deck space and the practical details of moving equipment between jobs.

Handover photograph to come
The customer, their finished trailer and the beginning of its next chapter.
Build typeCustom beaver tail trailer
Design focusMachinery, loading & deck layout
Project detailsSample layout · awaiting confirmation
01 / The starting point

The machine comes first.
The trailer follows.

In this illustrative project, the brief is to bring a machine and its working attachments together on one trailer. The aim is a layout that makes sense from the first approach to the ramps through to positioning and securing the load.

The starting point is the complete equipment list. Machine weight, attachments, wheel or track spacing and ground clearance all matter. So do the tow vehicle and the space available to load at the yard and on site.

Rather than choosing a deck length first and trying to make everything fit, the concept starts with the load. That gives the design discussion a practical focus: what needs to travel, where it will sit and how it will get on and off.

Original brief / equipment photograph
Show the equipment or load that shaped the customer’s requirements.
Drawing / workshop progress photograph
From the first layout discussion to a design ready for review.
02 / Working it out together

Talk through the load.
Work out the layout.

The first conversations focus on the loading sequence. Will the machine drive on under its own power? Is a winch required? Which attachments travel with it, and can they be loaded without blocking the main machine?

Ramp length, ramp spacing, deck height and the rear transition need to be considered together. A beaver tail does not make every machine suitable for every loading arrangement; the intended equipment is what guides the review.

For this example, the design direction is an open deck with a clear loading path and separate consideration for the attachments. Ramp storage, restraint positions and optional equipment are discussed around that layout rather than added as an afterthought.

03 / Taking shape

From a conversation
to something tangible.

The side profile tells part of the story. The flat working deck, sloping rear section and loading ramps form one route onto the trailer. Workshop progress photographs will show how those elements come together.

Full-width fabrication photograph
A progress photograph showing the trailer during construction.

Every transition matters.

For this concept, the key question is how the machine passes from the ramps, across the rear transition and onto the deck. The proposed layout would be checked against the actual machine dimensions, clearance and loading requirements before it is confirmed.

Space around the load matters too. Restraint points need to be accessible, attachments need an agreed position and any toolbox or winch must fit without obstructing the loading route. These are the decisions that turn deck space into a workable arrangement.

04 / A closer look

Small decisions.
Everyday differences.

Three parts of the proposed design deserve a closer look: the loading route, the deck arrangement and the equipment that supports everyday use. Final features will be confirmed for the actual build.

Beaver tail / ramp detail
Detail photograph to be added.
01

Ramps matched to the job.

Ramp dimensions, spacing, attachment method and rated capacity would be selected for the intended equipment. Storage and handling are part of the same discussion, so the ramps have a considered place when travelling as well as when loading.

Deck / restraint detail
Detail photograph to be added.
02

Deck space with a purpose.

The proposed deck gives the main machine a defined position while allowing for the attachments carried alongside it. Actual loaded mass, weight distribution and restraint requirements would guide the final arrangement.

Winch / toolbox detail
Detail photograph to be added.
03

Options that earn their place.

A winch, toolbox, stabiliser legs or additional restraint points may be useful depending on the job. The specification should explain which options were selected and how each one supports the intended loading and transport setup.

05 / The finished specification

The build.
In detail.

The final specification will record the deck dimensions, loading equipment, ratings and accessories agreed for this particular trailer. Figures remain unfilled here until the completed build details are available.

Every enquiry starts with a different load and a different way of working. This project can be a starting point for your own brief, with the final configuration assessed around your requirements.

Tell us what you need ↗
Project specifications — to be completed with verified figures
Customer / industryTo be confirmed
Usable flat deck dimensionsTo be confirmed
Overall dimensionsTo be confirmed
ATM ratingTo be confirmed
Tare massTo be confirmed
Available payloadTo be confirmed
Chassis & deck materialsTo be confirmed
Floor constructionTo be confirmed
Axles, suspension & brakesTo be confirmed
Beaver tail length & angleTo be confirmed
Winch, toolbox & accessoriesTo be confirmed
Ramps: dimensions & capacityTo be confirmed
Ramp storage & stabilisersTo be confirmed
Colour & protective finishTo be confirmed

Ratings and equipment must reflect the completed trailer and its identification plate. No numerical specification is implied by the illustrations.

Finished trailer / handover photograph
Add a finished-trailer view or a second handover photograph.
06 / Ready for its next chapter

The best part?
Seeing it put to work.

Handover brings the discussion back to the original load. It is the opportunity to review the finished deck layout, the loading equipment and the features selected for the customer’s work.

For this example, the handover story would cover ramp handling and storage, the intended load arrangement, fitted accessories and the documentation supplied with the trailer. The actual project photographs will show the finished setup.

The next chapter happens on the job. Customer feedback about the loading arrangement, deck space and day-to-day use can bring the story to life once the trailer is in service. Any published comments will come from the actual customer.

Thinking about your own build?

A few useful
starting points.

Can I enquire about a similar trailer?

Yes. Use our custom-build enquiry form and mention this beaver tail trailer example. Include the machinery and attachments you need to carry, along with the features you would like us to consider.

What information should I prepare?

Start with machine makes and models, operating weights, attachment weights, dimensions, wheel or track spacing and your tow vehicle. Photos and equipment specifications are helpful. If you do not have every detail, tell us where you need advice.

How far ahead should I plan?

Custom builds have a minimum 16-week lead time. Your project’s schedule and commencement point are confirmed in the written quote. Where new drawings are required, a minimum 10% deposit is required, with the scope and payment terms confirmed before proceeding.

Your brief. Your next build.

Your work is different.
Your trailer can be too.

Tell us about your machinery, attachments and the way you load. Our custom-build enquiry form gathers the key details so we can discuss a trailer layout suited to your work.

RMF Equipment · Maddington, Western Australia← Back to custom builds
Scroll to Top